Data Platform Migration: From On-Premise to Cloud

Hướng dẫn chi tiết migrate Data Platform từ on-premise lên cloud. Strategies, tools, timeline, pitfalls để tránh. Case study thực tế 80TB Oracle → Snowflake trong 12 tháng.

Sơn Nguyễn

Sơn Nguyễn

Data Platform Architect

Data Platform Migration from On-Premise to Cloud
#Cloud Migration#Data Platform#On-Premise to Cloud#Snowflake#BigQuery#Migration Strategy#ETL

TL;DR

  • Cloud migration = Move Data Platform từ on-premise lên cloud (AWS, GCP, Azure)
  • Why migrate: Cost savings (30-50%), scalability, modern features, disaster recovery
  • 3 patterns: Lift-and-shift (nhanh, không optimal), Re-platform (cân bằng), Re-architect (best, nhưng mất thời gian nhất)
  • Best strategy: Strangler Fig Pattern (migrate incrementally, low risk)
  • Timeline: 6-18 months cho enterprise (depends on complexity)
  • Challenges: Network bandwidth, downtime, application compatibility, cost overruns
  • Case study: Manufacturing company 80TB Oracle → Snowflake, 12 months, 50% cost reduction, 5x performance
  • Success factors: Executive buy-in, phased approach, thorough testing, team training

Giới Thiệu: Why Migrate to Cloud?

Vấn Đề với On-Premise Data Platforms

Typical on-premise setup:

Infrastructure:
- Oracle Database (Exadata) hoặc SQL Server cluster
- Physical servers trong data center
- SAN storage (expensive)
- ETL tools: Informatica, SSIS, Talend trên VMs
- BI tools: Tableau Server, Power BI on-prem

Costs:
- CapEx: $500K-$2M upfront (servers, storage, licenses)
- OpEx: $200K-$500K/year (maintenance, data center, team)
- Scaling: Mua thêm hardware (6-12 months lead time)

Pain points:

  • High upfront cost: Phải invest $1M+ trước khi có value
  • Scaling slow: Cần hardware mới 6-12 tháng
  • Disaster recovery expensive: Secondary data center = 2x cost
  • Maintenance overhead: Patching, upgrades, hardware failures
  • Limited innovation: Stuck với old versions, khó upgrade

Benefits of Cloud Migration

Cloud Data Platform:

Infrastructure:
- Snowflake, BigQuery, Redshift (fully managed)
- Auto-scaling compute
- Cheap cloud storage (S3, GCS, ADLS)
- Managed ETL (Glue, Dataflow, Data Factory)
- Cloud BI (Looker, Power BI Service)

Costs:
- CapEx: $0 (no upfront investment)
- OpEx: $50K-$200K/year (pay-as-you-go)
- Scaling: Instant (click a button)

Benefits:

  • Cost savings: 30-50% lower TCO (Total Cost of Ownership)
  • Scalability: Scale từ GB → PB trong minutes
  • Performance: Modern cloud warehouses 5-10x faster
  • Disaster recovery: Built-in geo-replication
  • Modern features: ML, streaming, lakehouse
  • Pay-per-use: Không lãng phí capacity

ROI calculation (5-year TCO):

Cost ItemOn-PremiseCloudSavings
Initial Investment$1,000,000$0$1,000,000
Annual Licenses$200,000$100,000$100,000/year
Infrastructure$100,000/year$50,000/year$50,000/year
Team (DevOps/DBAs)$300,000/year$150,000/year$150,000/year
5-year Total$3,600,000$1,500,000$2,100,000 (58%)

Beyond cost: Faster time-to-market, better analytics, modern features.


Migration Patterns

1. Lift-and-Shift (Rehost)

Definition: Move VMs/databases to cloud as-is, minimal changes.

Example:

  • Oracle on-prem → Oracle on RDS/EC2
  • SQL Server on-prem → SQL Server on Azure VM

Pros ✅:

  • Fast (1-3 months)
  • Low risk (no code changes)
  • Quick cost savings (no data center rent)

Cons ❌:

  • Not cloud-native (không tận dụng cloud advantages)
  • Still pay for licenses (Oracle/SQL Server expensive on cloud)
  • Limited scalability improvements

When to use: Quick migration để thoát data center contract, migrate later to cloud-native.

2. Re-platform (Lift-and-Reshape)

Definition: Minor modifications để leverage cloud services.

Example:

  • Oracle on-prem → Amazon RDS for Oracle (managed)
  • SQL Server on-prem → Azure SQL Database (PaaS)

Pros ✅:

  • Faster than re-architect (3-6 months)
  • Leverage managed services (less ops)
  • Some cost savings

Cons ❌:

  • Still tied to legacy tech (Oracle, SQL Server)
  • Limited modern features

When to use: Balance giữa speed và modernization.

3. Re-architect (Cloud-Native)

Definition: Redesign Data Platform cho cloud-native architecture.

Example:

  • Oracle/SQL Server → Snowflake/BigQuery/Redshift
  • Informatica → dbt + Airflow/Prefect
  • Tableau Server → Looker/Power BI Service

Pros ✅:

  • Maximize cloud benefits (cost, performance, scalability)
  • Modern architecture (ELT instead of ETL, lakehouse)
  • Best long-term value

Cons ❌:

  • Longest timeline (6-18 months)
  • Requires code rewrite (SQL, ETL)
  • Team reskilling needed

When to use: Khi có time & budget, want modern platform.


Assessment Phase

Step 1: Inventory

Data sources:

# Spreadsheet hoặc tool (e.g., Collibra, Alation)
inventory = {
    "databases": [
        {"name": "Oracle Prod", "size": "50TB", "tables": 500},
        {"name": "SQL Server DWH", "size": "30TB", "tables": 200},
        {"name": "MySQL App DB", "size": "5TB", "tables": 100}
    ],
    "etl_jobs": [
        {"tool": "Informatica", "jobs": 200},
        {"tool": "SSIS", "jobs": 150}
    ],
    "reports": [
        {"tool": "Tableau", "dashboards": 100, "users": 500}
    ]
}

Output: Complete list of databases, pipelines, reports, users.

Step 2: Complexity Scoring

ComponentComplexityRiskEffort (weeks)
Oracle Prod (50TB)HighHigh12
SQL Server DWH (30TB)MediumMedium8
MySQL App DB (5TB)LowLow2
Informatica (200 jobs)HighHigh16
Tableau (100 dashboards)LowLow4

Total effort: 42 weeks (10 months) → Budget 12-15 months với buffer.

Step 3: Dependencies Mapping

Dependency graph:

[Oracle Prod DB]
      ↓
[Informatica ETL] → [SQL Server DWH]
      ↓                    ↓
[Business Apps]      [Tableau Dashboards]
      ↓                    ↓
  [Users]              [Users]

Critical path: Oracle → Informatica → DWH → Tableau Migration order: Migrate này theo thứ tự reverse (Tableau first, Oracle last).

Step 4: Estimate Cost

Cloud cost estimation:

# BigQuery example
storage_cost = 80 * 1024 * 0.02  # 80TB * $0.02/GB/month = $1,638/month
compute_cost = 50 * 5  # 50TB scanned/month * $5/TB = $250/month

total_monthly = storage_cost + compute_cost  # $1,888/month
annual = total_monthly * 12  # $22,656/year

# vs On-Premise Oracle: $200K/year licenses
savings = 200_000 - 22_656  # $177K/year (89% savings)

ROI: Positive sau 6 months (migration cost: $100K, annual savings: $177K).


Migration Strategies

Strategy 1: Big Bang

Definition: Migrate toàn bộ hệ thống cùng lúc trong 1 weekend.

Timeline:

Friday 6 PM: Stop all pipelines
Friday 6 PM - Sunday 6 PM: Migrate data
Sunday 6 PM: Test
Monday 6 AM: Go live (or rollback)

Pros ✅:

  • Fast (1 weekend)
  • No dual operations

Cons ❌:

  • High risk (nếu fail, toàn bộ down)
  • Long downtime (24-48 hours)
  • Hard to rollback

When to use: Small systems (<10TB), tolerate downtime.

Strategy 2: Phased Migration

Definition: Migrate từng component, incrementally.

Timeline:

Phase 1 (Month 1-2): BI layer (Tableau → Looker)
Phase 2 (Month 3-4): DWH (SQL Server → Snowflake)
Phase 3 (Month 5-8): ETL (Informatica → dbt)
Phase 4 (Month 9-12): Source DBs (Oracle → RDS)

Pros ✅:

  • Lower risk (fail 1 phase, others unaffected)
  • Short downtime per phase
  • Learn & improve each phase

Cons ❌:

  • Dual operations (run both old & new systems)
  • Complex (data sync old ↔ new)
  • Longer total timeline

When to use: Enterprise systems, cannot tolerate long downtime.

Strategy 3: Hybrid (Temporary)

Definition: Keep một phần on-prem, migrate phần khác lên cloud.

Example:

  • Keep Oracle on-prem (legacy apps depend on it)
  • Migrate DWH to Snowflake (analytics workloads)
  • Sync Oracle → Snowflake via CDC

Pros ✅:

  • Immediate value (analytics on cloud)
  • Don't break legacy apps

Cons ❌:

  • Complex networking (VPN, data sync)
  • Dual costs (on-prem + cloud)
  • Not long-term solution

When to use: Legacy systems khó migrate, want quick wins.


Recommended Approach: Strangler Fig Pattern

What is Strangler Fig?

Concept: Build new cloud platform parallel to old, migrate workloads one-by-one, retire old when empty.

Year 0: 100% on-prem
         ↓
Year 1: 70% on-prem, 30% cloud (migrate low-risk workloads)
         ↓
Year 2: 30% on-prem, 70% cloud (migrate critical workloads)
         ↓
Year 3: 0% on-prem, 100% cloud (retire old system)

Named after: Strangler fig tree (mọc quanh cây cũ, dần thay thế).

Implementation Steps

Step 1: Setup Cloud Landing Zone

# AWS example
1. Create VPC (network isolation)
2. Setup VPN/Direct Connect to on-prem
3. Configure IAM roles (security)
4. Enable CloudTrail, GuardDuty (compliance)
5. Create S3 buckets (data lake)
6. Provision Redshift/Snowflake/BigQuery

Step 2: Migrate BI Layer First

Why BI first?

  • Low risk (doesn't affect source systems)
  • Quick win (better dashboards)
  • Users adopt cloud early

Example:

Old: Tableau Server on-prem → Oracle DWH
New: Looker (cloud) → Snowflake

Step-by-step:
1. Snapshot Oracle DWH → Snowflake (initial load)
2. Setup CDC (Oracle → Snowflake sync)
3. Recreate Tableau dashboards in Looker
4. UAT với users
5. Cutover (point users to Looker)
6. Deprecate Tableau Server (sau 2 weeks validation)

Step 3: Migrate Data Warehouse

Example:

Old: SQL Server DWH (on-prem)
New: Snowflake (cloud)

Data migration:
1. Initial bulk load (SQL Server → S3 → Snowflake)
   - Use AWS DMS or COPY command
2. CDC setup (ongoing sync during migration)
   - Debezium, Qlik Replicate, Striim
3. Parallel run (queries on both old & new, compare results)
4. Cutover

Step 4: Migrate ETL Pipelines

Old: Informatica PowerCenter (200 jobs) New: dbt + Airflow

# Conversion
Informatica mapping → dbt SQL model

# Example
# Informatica: Transformation "Aggregate Sales"
# Input: orders (order_id, product_id, amount, date)
# Output: daily_sales (date, product_id, total_amount)

# dbt equivalent
# models/marts/fct_daily_sales.sql
SELECT
    DATE(order_date) AS sale_date,
    product_id,
    SUM(amount) AS total_amount
FROM {{ ref('stg_orders') }}
GROUP BY 1, 2

Migration:

  1. Convert 10 jobs (pilot)
  2. Test, validate
  3. Convert remaining 190 jobs (batch)
  4. Deprecate Informatica (sau khi all jobs stable)

Step 5: Migrate Source Databases (Last)

Old: Oracle 50TB (legacy apps read from it) New: Oracle RDS (managed) hoặc migrate apps to cloud

Why last? Most risky, many dependencies.

Step 6: Decommission On-Premise

Checklist:
☑ All workloads migrated
☑ No traffic to old system (monitor 2 weeks)
☑ Backups transferred to cloud
☑ Data retention policies met
☑ Shutdown old servers
☑ Cancel data center contract

Technical Steps: Data Migration

Step 1: Initial Bulk Load

AWS Database Migration Service (DMS):

# Create replication instance
aws dms create-replication-instance \
  --replication-instance-identifier oracle-to-snowflake \
  --replication-instance-class dms.c5.xlarge

# Create source endpoint (Oracle)
aws dms create-endpoint \
  --endpoint-identifier oracle-source \
  --endpoint-type source \
  --engine-name oracle \
  --server-name oracle.company.com \
  --port 1521 \
  --database-name PROD

# Create target endpoint (Snowflake via S3)
aws dms create-endpoint \
  --endpoint-identifier s3-target \
  --endpoint-type target \
  --engine-name s3 \
  --s3-settings BucketName=migration-data

# Create migration task
aws dms create-replication-task \
  --replication-task-identifier migrate-oracle-tables \
  --source-endpoint-arn <oracle-arn> \
  --target-endpoint-arn <s3-arn> \
  --migration-type full-load-and-cdc \
  --table-mappings file://table-mappings.json

Transfer 50TB data: 2-5 days (depends on network bandwidth).

Bandwidth calculation:

50TB = 50 * 1024 GB = 51,200 GB
Network: 100 Mbps = 12.5 MB/s = 45 GB/hour

Transfer time = 51,200 GB / 45 GB/hour = 1,138 hours = 47 days

With 1 Gbps link: 4.7 days

Solution: AWS Snowball (ship hard drives) cho >10TB.

Step 2: Change Data Capture (CDC)

Why CDC? Initial load mất vài ngày, data thay đổi trong lúc đó. CDC sync changes.

Tools:

  • Debezium: Open-source CDC (MySQL, Postgres, SQL Server, Oracle)
  • AWS DMS: Built-in CDC
  • Qlik Replicate: Enterprise CDC tool
  • Striim: Real-time data integration

Debezium example (Postgres → Kafka → Snowflake):

# Debezium connector config
{
  "name": "postgres-cdc-connector",
  "config": {
    "connector.class": "io.debezium.connector.postgresql.PostgresConnector",
    "database.hostname": "postgres.company.com",
    "database.port": "5432",
    "database.user": "replication_user",
    "database.dbname": "production",
    "database.server.name": "prod_db",
    "table.include.list": "public.orders,public.customers",
    "plugin.name": "pgoutput"
  }
}

Data flow:

Postgres → Debezium → Kafka → Snowflake Kafka Connector → Snowflake

Latency: 1-5 minutes (near real-time).

Step 3: Data Validation

Row count validation:

-- Source (Oracle)
SELECT COUNT(*) FROM orders WHERE order_date >= '2025-01-01';
-- Result: 1,234,567

-- Target (Snowflake)
SELECT COUNT(*) FROM orders WHERE order_date >= '2025-01-01';
-- Result: 1,234,567 ✅ Match

Checksum validation:

-- Source
SELECT SUM(CAST(order_id AS NUMBER)) AS checksum FROM orders;
-- Result: 98765432109876

-- Target
SELECT SUM(order_id::NUMBER) AS checksum FROM orders;
-- Result: 98765432109876 ✅ Match

Schema validation:

import pandas as pd

# Compare schemas
source_schema = get_schema("oracle", "orders")
target_schema = get_schema("snowflake", "orders")

diff = compare_schemas(source_schema, target_schema)
# Check: column names, types, nullability

Step 4: Parallel Run

Run queries on both old & new systems, compare results:

-- Query on Oracle
SELECT product_id, SUM(amount) as revenue
FROM orders
WHERE order_date >= '2025-01-01'
GROUP BY product_id
ORDER BY revenue DESC
LIMIT 10;

-- Same query on Snowflake
SELECT product_id, SUM(amount) as revenue
FROM orders
WHERE order_date >= '2025-01-01'
GROUP BY product_id
ORDER BY revenue DESC
LIMIT 10;

-- Compare results (should match)

Parallel run duration: 2-4 weeks (build confidence).

Step 5: Cutover

Cutover weekend:

Friday 6 PM:
- Stop CDC (no more changes to old system)
- Final data sync
- Final validation

Saturday:
- Update connection strings (apps point to new DB)
- Test critical workflows

Sunday:
- Monitor, fix issues

Monday:
- Go live

Rollback plan: Keep old system running 2 weeks (in case need to rollback).


Challenges & Solutions

Challenge 1: Network Bandwidth

Problem: 80TB data transfer over 100 Mbps = 74 days.

Solutions:

  • Upgrade network: 1 Gbps link (7.4 days)
  • AWS Snowball: Ship hard drives (receive in 1 week, upload in 1 day)
  • Incremental migration: Migrate 10TB/month over 8 months
  • Compress data: Reduce 80TB → 40TB (2x faster)

Challenge 2: Downtime Requirements

Problem: Business requires < 4 hours downtime.

Solutions:

  • CDC: Continuous sync, minimal downtime cutover
  • Blue-Green deployment: New system parallel, instant switch
  • Read replicas: Migrate read traffic first, writes last

Challenge 3: Application Compatibility

Problem: Legacy apps expect Oracle-specific SQL/features.

Example:

-- Oracle syntax
SELECT * FROM orders WHERE ROWNUM <= 10;

-- Snowflake syntax
SELECT * FROM orders LIMIT 10;

Solutions:

  • Code audit: Find Oracle-specific code
  • Rewrite: Convert to standard SQL or Snowflake syntax
  • Emulation layer: Use tools like Striim to translate queries (temporary)

Challenge 4: Cost Overruns

Problem: Cloud costs higher than expected.

Example: Forgot to optimize queries → BigQuery scans 100TB/month = $500 (expected $50).

Solutions:

  • Cost monitoring: Set budget alerts
  • Query optimization: Partition tables, cluster keys
  • Reserved capacity: Commit to 1-year for 30% discount
  • Governance: Review & approve expensive queries

Challenge 5: Team Skillset

Problem: Team knows Oracle, not Snowflake/BigQuery.

Solutions:

  • Training: 2-week bootcamp on new platform
  • Vendor support: Snowflake/Google provide migration assistance
  • Hire experts: Temporary contractors for migration
  • Carptech consulting 😊

Timeline: Typical Enterprise Migration

6-Month Timeline (Small/Medium)

MonthMilestoneActivities
1Assessment & PlanningInventory, complexity scoring, cloud selection
2Setup Cloud EnvironmentLanding zone, networking, security
3Migrate BI LayerDashboards → Cloud BI, UAT
4Migrate DWH (Phase 1)Initial load, CDC setup, validation
5Migrate ETL PipelinesConvert jobs to dbt/Airflow, testing
6Cutover & OptimizationFinal cutover, decommission old, optimize costs

12-Month Timeline (Large Enterprise)

QuarterMilestoneActivities
Q1Assessment & SetupInventory, cloud setup, pilot migration (1 report)
Q2Migrate Non-CriticalDev/test environments, BI layer
Q3Migrate Critical WorkloadsProduction DWH, ETL pipelines
Q4Source DB Migration & CleanupMigrate source databases, decommission on-prem

Best Practices

1. Executive Buy-In

Critical: Migration is strategic decision, needs C-level support.

Build business case:

Cost savings: $2M over 5 years
Performance: 5x faster queries → better decisions
Scalability: Support 10x data growth
Innovation: ML, real-time analytics

Present to CFO, CTO, CEO → Get approval & budget.

2. Start Small (Pilot)

Don't migrate everything at once:

Pilot: Migrate 1 low-risk dashboard
Timeline: 2 weeks
Learn: Network bottlenecks, query performance, team gaps
Iterate: Fix issues before full migration

Success → Confidence → Full rollout.

3. Thorough Testing

Test types:

  • Functional: Queries return correct results
  • Performance: Queries faster on cloud (or acceptable)
  • Load: Handle peak traffic
  • Failover: Disaster recovery works

UAT (User Acceptance Testing): 10-20 power users test 2 weeks before cutover.

4. Communication

Stakeholders to inform:

  • Users: New BI tool, new login, new features
  • Executives: Progress updates, risks
  • IT teams: Network changes, security
  • Finance: Cost tracking

Weekly status reports: On track / at risk / blockers.

5. Monitor Costs

Cloud cost surprises common:

# Set budget alert
aws budgets create-budget \
  --budget BudgetName=DataPlatformMigration,BudgetLimit=10000,TimeUnit=MONTHLY

# Daily cost review
SELECT
    DATE(usage_start_time) AS day,
    SUM(cost) AS daily_cost
FROM billing_export
GROUP BY 1
ORDER BY 1 DESC;

Action: If cost spike → Investigate & optimize immediately.


Case Study: Manufacturing Company

Background

Company: Manufacturing, 2,000 employees Old System:

  • Oracle Exadata (80TB data)
  • Informatica PowerCenter (300 ETL jobs)
  • Tableau Server (150 dashboards, 500 users)
  • Cost: $500K/year (licenses + data center)

Pain Points:

  • Oracle queries slow (10-20 seconds)
  • Scaling expensive (need new Exadata box = $1M)
  • ETL jobs brittle (failures common)

Migration Plan

Target: Snowflake (cloud data warehouse)

Timeline: 12 months

Strategy: Strangler Fig (phased migration)

Implementation

Month 1-2: Assessment

  • Inventoried 500 tables, 300 ETL jobs, 150 dashboards
  • Complexity scoring
  • Estimated Snowflake cost: $150K/year (70% savings)

Month 3: Cloud Setup

  • Provisioned Snowflake (X-Large warehouse)
  • Setup VPN (on-prem ↔ AWS)
  • Created S3 data lake

Month 4-5: Pilot Migration

  • Migrated 1 dashboard (Sales dashboard)
    • Oracle → Snowflake (initial load: 5TB)
    • Recreated in Tableau Cloud
  • UAT: 10 sales users tested 2 weeks
  • Result: Queries 8x faster (20s → 2.5s)

Month 6-8: DWH Migration

  • Bulk load: 80TB Oracle → S3 → Snowflake (3 weeks)
  • CDC setup: Debezium (Oracle → Kafka → Snowflake)
  • Parallel run: 4 weeks (validated results)
  • Cutover: Weekend, 6 hours downtime

Month 9-11: ETL Migration

  • Converted 300 Informatica jobs → dbt (100 models)
    • Hired Carptech consultants (accelerated migration)
  • Orchestration: Airflow on MWAA (AWS managed)
  • Testing: 3 weeks

Month 12: BI Migration

  • 150 Tableau dashboards → Tableau Cloud (reconnected to Snowflake)
  • User training: 2-day workshop
  • Go live

Results

Performance:

  • Query speed: 5x faster (average 10s → 2s)
  • ETL runtime: 50% faster (dbt parallel execution)
  • Data freshness: 24 hours → 1 hour (CDC)

Cost:

  • Old: $500K/year
  • New: $250K/year
    • Snowflake: $150K
    • AWS (S3, Airflow, networking): $50K
    • Tools (Tableau Cloud, dbt Cloud): $50K
  • Savings: $250K/year (50% reduction)

Other Benefits:

  • ✅ Zero downtime scaling (vs 6 months for Oracle)
  • ✅ Built-in disaster recovery (Snowflake replication)
  • ✅ Team productivity: Data engineers focus on analytics, not infrastructure

ROI: Migration cost $400K (consultants, team time), payback in 1.6 years.


Migration Checklist (60 Items)

Assessment Phase

  • Inventory all databases, sizes, schemas
  • List all ETL/ELT jobs, dependencies
  • Catalog BI reports, dashboards, users
  • Map data lineage (source → transformations → reports)
  • Identify PII/sensitive data (GDPR/PDPA compliance)
  • Assess network bandwidth (on-prem ↔ cloud)
  • Complexity scoring (simple/medium/high for each component)
  • Estimate cloud costs (calculator: AWS, GCP, Azure)
  • Build business case (cost savings, benefits)
  • Get executive buy-in (CFO, CTO, CEO approval)

Planning Phase

  • Choose cloud provider (AWS, GCP, Azure)
  • Choose target architecture (Snowflake, BigQuery, Redshift)
  • Define migration strategy (big bang, phased, strangler fig)
  • Create project plan (timeline, milestones, resources)
  • Identify pilot workload (low-risk, high-value)
  • Assign roles (project manager, architects, engineers, testers)
  • Setup communication plan (stakeholder updates)
  • Risk assessment (network, downtime, skills, budget)
  • Contingency planning (rollback procedures)

Cloud Setup Phase

  • Provision cloud accounts (AWS, GCP, Azure)
  • Setup VPC/networking (isolation, subnets)
  • Configure VPN/Direct Connect (on-prem connectivity)
  • Setup IAM roles & policies (security)
  • Enable logging & monitoring (CloudTrail, CloudWatch)
  • Create S3/GCS buckets (data lake staging)
  • Provision cloud data warehouse (Snowflake, BigQuery, Redshift)
  • Setup encryption (at rest, in transit)
  • Configure backup policies
  • Compliance checks (GDPR, PDPA, SOC 2)

Data Migration Phase

  • Install migration tools (AWS DMS, Striim, Debezium)
  • Create source endpoints (on-prem databases)
  • Create target endpoints (cloud warehouse, S3)
  • Schema conversion (Oracle → Snowflake, etc.)
  • Initial bulk load (full copy of data)
  • Validate row counts (source vs target)
  • Validate checksums (data integrity)
  • Setup CDC (ongoing sync)
  • Monitor CDC lag (< 5 minutes)
  • Test data freshness

ETL/Pipeline Migration Phase

  • Audit existing ETL jobs (Informatica, SSIS, etc.)
  • Choose new orchestration (Airflow, Prefect, dbt Cloud)
  • Convert ETL jobs to ELT (SQL-based transformations)
  • Rewrite jobs in dbt (models, tests, docs)
  • Setup CI/CD for dbt (git, dbt Cloud)
  • Test transformed data (compare old vs new)
  • Schedule jobs (Airflow DAGs, dbt Cloud scheduler)
  • Monitor job success rates

BI Migration Phase

  • Inventory dashboards (Tableau, Power BI, etc.)
  • Choose cloud BI (Looker, Tableau Cloud, Power BI Service)
  • Recreate dashboards in new BI tool
  • Update data sources (point to cloud warehouse)
  • User training (2-day workshop)
  • UAT with power users (2 weeks)
  • Gather feedback, iterate

Testing Phase

  • Functional testing (queries return correct data)
  • Performance testing (query latency, throughput)
  • Load testing (simulate peak traffic)
  • Failover testing (disaster recovery)
  • Security testing (access controls, encryption)
  • Compliance testing (PII handling, audit logs)

Cutover Phase

  • Schedule cutover window (weekend, low-traffic)
  • Notify all stakeholders (1 week before)
  • Stop CDC (freeze old system)
  • Final data sync
  • Final validation (row counts, checksums)
  • Update connection strings (apps → cloud)
  • Test critical workflows
  • Monitor errors, performance
  • Rollback plan ready (if issues)

Post-Migration Phase

  • Monitor cloud costs (daily)
  • Optimize queries (partitioning, clustering)
  • Review performance (vs SLAs)
  • Gather user feedback
  • Document lessons learned
  • Decommission on-premise (after 2 weeks validation)
  • Cancel data center contracts
  • Celebrate success! 🎉

Kết Luận

Key Takeaways

Cloud migration delivers 30-50% cost savings, 5x performance, infinite scalability ✅ 3 patterns: Lift-and-shift (fast), Re-platform (balanced), Re-architect (best long-term) ✅ Strangler Fig strategy: Migrate incrementally, low risk, high success rate ✅ Timeline: 6-18 months (depends on size, complexity) ✅ Challenges: Network bandwidth, downtime, skills, costs → All solvable with planning ✅ Success factors: Executive buy-in, pilot first, thorough testing, communication

Recommendations

Cho Small/Medium Companies:

  • Choose re-architect (cloud-native) → Maximize benefits
  • Use managed services (BigQuery, Snowflake, dbt Cloud) → Zero ops
  • Timeline: 6 months
  • Cost: $50K-$200K (consultants, migration tools)

Cho Large Enterprises:

  • Strangler Fig pattern (phased migration) → Lower risk
  • Pilot first (1 dashboard) → Learn before full rollout
  • Timeline: 12-18 months
  • Cost: $200K-$1M (team time, consultants, dual operations)

Migration path:

  1. Build business case → Get executive buy-in
  2. Choose cloud & target architecture
  3. Pilot migration (1 low-risk workload)
  4. Full migration (phased)
  5. Optimize & iterate

Next Steps

Muốn migrate Data Platform lên cloud?

Carptech giúp bạn:

  • ✅ Assessment & migration planning (2 weeks)
  • ✅ Cloud architecture design (Snowflake, BigQuery, Redshift)
  • ✅ Hands-on migration (6-12 months)
  • ✅ Cost optimization (reduce 40-60% cloud spend)
  • ✅ Team training (upskill your engineers)

Chúng tôi đã migrate 10+ enterprises (banking, retail, manufacturing) từ Oracle/SQL Server lên cloud với success rate 100%.

📞 Liên hệ Carptech: carptech.vn


Related Posts:

Có câu hỏi về Data Platform?

Đội ngũ chuyên gia của Carptech sẵn sàng tư vấn miễn phí về giải pháp phù hợp nhất cho doanh nghiệp của bạn. Đặt lịch tư vấn 60 phút qua Microsoft Teams hoặc gửi form liên hệ.

✓ Miễn phí 100% • ✓ Microsoft Teams • ✓ Không cam kết dài hạn